top of page

Panhandle Plains Cancer Center Construction Progress Update | Steel Fabricators in Amarillo

  • Writer: H&H Fabrication
    H&H Fabrication
  • 9 hours ago
  • 2 min read

Construction at the Panhandle Plains Cancer Center continues to move forward with strong momentum as the project advances into key interior phases.

As one of the trusted steel fabricators in Amarillo, H&H Fabrication is proud to support a project that will expand access to critical cancer care services across the Texas Panhandle.
Construction site with a brick building, tarp-covered ground, and parked vehicles. Bright sun and clear sky create a calm mood.

1. A Healthcare Facility Built for the Panhandle Community

The Panhandle Plains Cancer Center is being developed to provide expanded cancer treatment, care, and support services closer to home for patients and families throughout the region. The goal of this facility is to reduce travel burdens while delivering high-quality care in a purpose-built, patient-focused environment designed to serve the community for decades to come.



2. Structural Steel Fabrication Supporting Interior Progress

The structural steel framework fabricated and supplied by H&H Fabrication is now fully installed and supporting the next stages of construction. As experienced steel fabricators in Amarillo, our role in this project emphasizes accuracy, coordination, and long-term structural performance.

With steel erection complete, interior trades have been able to move forward efficiently, maintaining alignment, clear spans, and dependable load paths throughout the building.


3. Drywall and Insulation Installation Underway

Interior build-out is well underway with drywall and insulation being installed across the facility. These systems are essential for energy efficiency, sound control, and occupant comfort—especially critical for a healthcare environment where patient experience and operational efficiency matter.

The precision of the steel structure allows interior crews to work efficiently without unnecessary rework or delays.


4. Electrical Systems Actively Being Installed

In parallel with interior wall construction, electrical installation is actively underway. Crews are running conduit and wiring to support lighting, medical equipment, and building systems throughout the cancer center. This milestone marks a major transition from structural construction to functional, operational spaces.


5. Estimated Opening Timeline for Panhandle Plains Cancer Center

With interior systems progressing steadily, the Panhandle Plains Cancer Center is moving closer to completion. The facility is anticipated to open in late 2025 or early 2026, pending final construction phases, inspections, and commissioning. Each milestone brings the project closer to serving patients across the Texas Panhandle.

Trusted Steel Fabricators in Amarillo

H&H Fabrication is proud to contribute to meaningful projects like the Panhandle Plains Cancer Center. As one of the leading steel fabricators in Amarillo, we are committed to precision fabrication, efficient scheduling, and dependable coordination on every project we touch.

If you’re planning an upcoming structural steel project and need a reliable fabrication partner, we’re ready to submit a bid.

📞 (806) 433-9471🌐 www.hhfabinc.com

Black and white logo reads "H&H FABRICATION INC" with a star. Bold text inside a rectangular frame, conveying professionalism.

 
 
 

Comments


bottom of page